Abstract/Summary

Local fire station, Station 15, in the community of Los Osos, was in need of a deck to be built in the rear of the station. There was public support, funding, and a desire for an upgrade. With the help of the firefighters and administrative staff at South Bay Fire Department, a 285 square foot structure was constructed to operate as a relaxing area for on duty staff to use between emergency calls. The plan creation, estimating, and building of the deck took approximately a year to complete. An estimated 305 man hours were spent collectively on the project, with great care given to the needs of the department and attention to detail. On June 11, 2016 the project was completed. The project took longer than scheduled and cost more than originally estimated.

Share

COinS