College - Author 1
College of Architecture and Environmental Design
Department - Author 1
Construction Management Department
Degree Name - Author 1
BS in Construction Management
Date
6-2017
Primary Advisor/Subject Matter Expert (SME)
Stacy Kolegraff, College of Architecture and Environmental Design, Construction Management Department
Abstract/Summary
This paper describes the construction process of an additional 192 SF storage area for an existing Nature Center, along with a new 1000 SF deck around the entire structure. The scope of work included the excavation and pouring of concrete piers and stem walls, framing of the subfloor, shear walls, roof, and deck, electrical rough-in and finish, roofing system, windows, doors, insulation, drywall, and decking. All work on this project was managed by the author, and construction was done by the author, subcontractors, local hires, and volunteers. Construction of the project took place between December 2016 and June 2017, and cost approximately $40,000. This paper will focus on means and methods, deliverables, knowledge and lessons learned, and how this knowledge will be brought into the construction industry.
URL: https://digitalcommons.calpoly.edu/cmsp/37