Abstract

Business Building (bldg 003)

Completion date: 1993

Square Feet: 75,970

Architect: Kaplan, McLaughlin, Diaz

General Contractor: A.J. Diani Construction

Construction System: Steel frame, exterior plaster, tile roof

Construction Cost: $13,500,000

Architectural Style: Post-Modern, Contextual

Cal Poly President: Warren J. Baker (1979-Present)

Post-Modern Contextual refers to buildings that not only reflect historical architectural styles, but that fit within the context of their surrounding buildings.

Share

COinS
 

URL: http://digitalcommons.calpoly.edu/fpcp_mp/7