Title
Recommended Citation
March 3, 1989, pages 1-116. Note: Files are large (165MB) and may take several moments to download.
Abstract
Business Building (bldg 003)
Completion date: 1993
Square Feet: 75,970
Architect: Kaplan, McLaughlin, Diaz
General Contractor: A.J. Diani Construction
Construction System: Steel frame, exterior plaster, tile roof
Construction Cost: $13,500,000
Architectural Style: Post-Modern, Contextual
Cal Poly President: Warren J. Baker (1979-Present)
Post-Modern Contextual refers to buildings that not only reflect historical architectural styles, but that fit within the context of their surrounding buildings.
URL: http://digitalcommons.calpoly.edu/fpcp_mp/7