Author Info

The Steinberg Group

Abstract

Faculty Offices East (Bldg 025)

Completion Date: 1991

Square Feet: 30,088

Architect: The Steinberg Group

General Contractor: R.P. Richards

Construction System: Steel frame, exterior plaster

Construction Cost: $3,200,000

Architectural Style: Post-Modern

Cal Poly President: Warren J. Baker (1979-Present)

Post-Modern architecture is a counter reaction to the strict and almost universal modernism of the mid-20th century. It reintroduces elements from historical building styles, although usually without their high level of detail. Common features include columns, pyramids, arches, obelisks, unusual or attention-getting shapes and roof lines, and combinations of stone and glass on the facade.

Share

COinS
 

URL: http://digitalcommons.calpoly.edu/fpcp_mp/32