College - Author 1

College of Engineering

Department - Author 1

Mechanical Engineering Department

Degree Name - Author 1

BS in Mechanical Engineering

College - Author 2

College of Engineering

Department - Author 2

Mechanical Engineering Department

Degree - Author 2

BS in Mechanical Engineering

College - Author 3

College of Engineering

Department - Author 3

Mechanical Engineering Department

Degree - Author 3

BS in Mechanical Engineering

College - Author 4

College of Engineering

Department - Author 4

Mechanical Engineering Department

Degree - Author 4

BS in Mechanical Engineering

Date

6-2024

Primary Advisor

Christopher Pascual, College of Engineering, Mechanical Engineering Department

Additional Advisors

Hyeonik Song, College of Engineering, Mechanical Engineering Department

Abstract/Summary

This report describes in detail the manufacturing, assembly, and testing of our hose clamp. We start with a review of the changes we have made to our design since our last report, namely a new automatic latching system, and continue with our manufacturing and assembly processes. Then we detail our testing procedures that we created to evaluate how well our design meets user needs and discuss the results of our tests. Unfortunately, our design did not meet our residual flow rate criteria and showed excessive leaking when clamped, so we end with some discussion of the issues our design has, and recommendations for how they may be remedied when this project is continued next year.

ME_S2024_F73_Video.mp4 (117874 kB)
Project Video

ME_S2024_F73_Poster.pdf (3159 kB)
Project Poster

ME_S2024_F73_SOW.pdf (1187 kB)
Scope of Work

ME_S2024_F73_PDR.pdf (1506 kB)
Preliminary Design Review

ME_S2024_F73_CDR.pdf (2239 kB)
Critical Design Review

ME_S2024_F73_Drawings.pdf (330 kB)
Drawing Package