College - Author 1

College of Engineering

Department - Author 1

Mechanical Engineering Department

Degree Name - Author 1

BS in Mechanical Engineering

College - Author 2

College of Engineering

Department - Author 2

Mechanical Engineering Department

Degree - Author 2

BS in Mechanical Engineering

College - Author 3

College of Engineering

Department - Author 3

Mechanical Engineering Department

Degree - Author 3

BS in Mechanical Engineering

College - Author 4

College of Engineering

Department - Author 4

Mechanical Engineering Department

Degree - Author 4

BS in Mechanical Engineering

Date

6-2023

Primary Advisor

Eileen Rossman, College of Engineering, Mechanical Engineering Department

Abstract/Summary

Team Weed Scouts has completed our work on a weed-cutting robot for the Girl Scouts of California’s Central Coast. The final robot build provides a solid foundation that can be built and improved upon by future teams. We have completed the robot base and structure, including the chassis, drivetrain, and robot shell. We also completed manufacturing a weed storage bin and canvas cover for the robot. Additionally, we have built a weed scooper, the mechanism that cuts weeds and transports them into a storage compartment. The electronics and programming for remote control of the robot are also implemented. After some testing, we found that the robot had limited functionality. It was able to drive around with slight power issues but unfortunately, the weed scooper was not able to fully cut and transport the weeds. Despite these obstacles, we have created a semi-operable foundation for future teams to optimize, test, and debug. The next steps include adding a weed shredder and developing autonomous robot functionality along with weed identification. Upon project completion, the weed-cutting robot will help maintain the grounds at Camp Arnaz and serve as a source of engineering inspiration for Girl Scouts and other camp visitors.

ME_S2023_F75_F76_Video.mov (382305 kB)
Project Video

ME_S2023_F7576_Poster.pdf (2369 kB)
Project Poster

ME_S2023_F75_SOW.pdf (2309 kB)
Scope of Work

ME_S2023_F76_SOW.pdf (2545 kB)
Scope of Work

ME_S2023_F75_PDR.pdf (4690 kB)
Preliminary Design Review

ME_S2023_F76_PDR.pdf (3329 kB)
Preliminary Design Review

ME_S2023_F75_F76_CDR.pdf (7419 kB)
Critical Design Report

ME_S2023_F75_F76_Drawings.pdf (4202 kB)
Drawing Package