Department - Author 1
Industrial and Manufacturing Engineering Department
Degree Name - Author 1
BS in Industrial Engineering
Date
6-2010
Primary Advisor
Tao Yang
Abstract/Summary
The use of time standards are the basis for a high efficiency system in the manufacturing environment. This project will investigate the process followed to design and develop a database used to calculate accurate cable assembly time standards used for scheduling at General Atomics. This project will then justify the use of the Cable Time Estimation Database, through an economic analysis compared to the current methods applied.
URL: https://digitalcommons.calpoly.edu/imesp/17
Abstract
SP_Title_Okerman_Joshua_June_3_2010.doc (25 kB)
Title Page
Included in
Industrial Engineering Commons, Operational Research Commons, Other Engineering Commons, Other Operations Research, Systems Engineering and Industrial Engineering Commons, Systems Engineering Commons