Date
6-2014
Degree Name
MS in Fire Protection Engineering
College
College of Engineering
Advisor
Frederick Mowrer and Christopher Pascual
Abstract
The building I have chosen to use as the model for exemplifying the components of a wet fire suppression system is Westside Christian High School (WCHS). This building completed construction in January of 2014 and is located at: 8200 SW Pfaffle Street Tigard, Oregon 97223. The existing structure was previously owned and occupied by City Bible Church who will now lease space from the High school during and after construction. The renovations include the addition of space for music, art classes, fitness center, gym, science labs, and others. The renovations will also be widening existing rooms and hallways. The core of the building will remain and the additional spaces are being added to each face.
https://digitalcommons.calpoly.edu/fpe_rpt/22
Final Presentation
DOI
10.15368/fperpt.2014.6