College - Author 1
College of Architecture and Environmental Design
Department - Author 1
Construction Management Department
Degree Name - Author 1
BS in Construction Management
College - Author 2
College of Architecture and Environmental Design
Department - Author 2
Construction Management Department
Degree - Author 2
BS in Construction Management
College - Author 3
College of Architecture and Environmental Design
Department - Author 3
Construction Management Department
Degree - Author 3
BS in Construction Management
Date
6-2023
Primary Advisor/Subject Matter Expert (SME)
Bryan Knakiewicz, College of Architecture and Environmental Design, Construction Management Design
Abstract/Summary
The project consists of multiple pieces that were done as a team to improve the outdoor areas of the United Methodist Children’s Center. The scope of the work consists of placing gorilla hair mulch, making a bench for the kids, removing, grading, and placing artificial turf, and replacing the canvas of a shade structure. There are a few other smaller pieces that will be completed as well but those are the main pieces of the project. The project was executed by teaming up with multiple companies and getting teams of students together to construct the pieces of the project in the timeline we were given. Being a children’s center, there was a challenge with working around their schedule and not interfering with the kids. This project began in February of 2023 and was completed on June 4, 2023. The children’s center was left with a cleaner, safer playground for their students to enjoy during their recess, and the members of the project team left with a new understanding of what goes into placing turf, mulch, building benches, and replacing a canvas shade structure.
URL: https://digitalcommons.calpoly.edu/cmsp/725
Poster Board