College - Author 1
College of Architecture and Environmental Design
Department - Author 1
Construction Management Department
Degree Name - Author 1
BS in Construction Management
Date
6-2021
Primary Advisor/Subject Matter Expert (SME)
Eric Brinkman, College of Architecture and Environmental Design, Construction Management Department
Abstract/Summary
This paper describes the preconstruction planning of an outdoor space at Terra Nova High School in Pacifica, Ca. The project involved the production of three separate proposals at a high, moderate, and low-cost point. Each proposal included a conceptual design, takeoff, estimate, and model renderings. To create the conceptual designs and estimates, several programs and outside sources were utilized, including Revit, Bluebeam, RS Means, and Precision Estimating Services. The end designs include varying combinations of outdoor picnic seating, site boulders, raised planter beds, and a concrete stage. The resulting proposals outline the expected project costs for each design as well as, define the project exclusions and design assumptions.
URL: https://digitalcommons.calpoly.edu/cmsp/459
Poster Board