Department - Author 1

Architectural Engineering Department

Degree Name - Author 1

BS in Aerospace Engineering

Date

4-2017

Primary Advisor

Kevin Dong

Abstract/Summary

The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.

Share

COinS