Abstract/Summary

The Bridge House, located in Poly Canyon, was originally constructed in 1968. Its original purpose served as a seismic activity lab for Architectural Engineering (ARCE) students. I joined a team of 4 ARCE students, making this an interdisciplinary project. There have been a few other groups who have tried to complete this project but have always fallen short. With the calculations and structural drawings provided by the ARCE students, we had a design and plan to fabricate the hand railings. We have completed 13 handrails, with four already installed on the structure by another group, that have now replaced the boards which have been restricting public access. As of June 11th, 2019 we have completed the project.