Date

6-2013

Degree Name

BS in Mechanical Engineering

Department

Mechanical Engineering Department

Advisor(s)

James G Locascio

Abstract

Quatro Composites creates various molded parts for an array of industries. They are seeking to improve their thermoplastic molding process by decreasing the amount of time to heat up the steel tool that molds the thermoplastics. Currently, it takes approximately 1 hour to heat up their 120 pound steel mold from room temperature to approximately 700°F. The goal of this project is to create an optimum heating method that will minimize that heating time to about 20 minutes or less. It is critical for the stakeholders (Quatro Composites) to have a faster heating time in order to increase their production capabilities.