Date

6-2010

Degree Name

BS in Industrial Engineering

Department

Industrial and Manufacturing Engineering Department

Advisor(s)

Tao Yang

Abstract

The use of time standards are the basis for a high efficiency system in the manufacturing environment. This project will investigate the process followed to design and develop a database used to calculate accurate cable assembly time standards used for scheduling at General Atomics. This project will then justify the use of the Cable Time Estimation Database, through an economic analysis compared to the current methods applied.