A project based senior project, the Far West Floating Dock Project included the design, procurement and construction of two 20’x 20’ floating docks for the Lake Nacimiento based nonprofit Far West Water Ski Club. Constructed of polyethylene coated floats, 4x Pressure Treated lumber, hot-dipped galvanized hardware and composite decking, the dock is designed to have a lifespan of at least 35-40 years. This case study provides an overview of the complete project delivery, beginning with the conception and research, transitioning to design and procurement, and finishing with construction and lessons learned. The overall project cost landed at $21,712.00, made possible by donations from Far West Water Ski Club members. An 800SF floating dock, effective segmented construction process allowing a crew to lift, float and attach individual segments of the dock and many other valuable lessons were outcomes of this project.

Share

COinS