College - Author 1
College of Architecture and Environmental Design
Department - Author 1
Construction Management Department
Degree Name - Author 1
BS in Construction Management
Date
6-2025
Primary Advisor/Subject Matter Expert (SME)
Eric Brinkman, College of Architecture and Environmental Design, Construction Management Department
Abstract/Summary
This paper outlines the design-build process led by an interdisciplinary team of Construction Management students from California Polytechnic State University, San Luis Obispo, to construct four concrete benches. In collaboration with faculty, concrete specialists, and the non-profit organization R.A.C.E. Matters, the project launched in Winter 2025. R.A.C.E. Matters initiated the effort by requesting the design and installation of benches at scenic, high-visibility locations managed by the San Luis Obispo Land Conservancy: Pismo Preserve, the Octagon Barn, and Kathleen’s Overlook. The full project scope included design development, structural calculations, prefabrication, on-site construction, and final installation. Each bench will serve as a canvas for murals celebrating diverse racial and cultural narratives, aligning with the organization’s mission. The project demanded close coordination with multiple stakeholders and reflected real-world industry practices. While the academic setting allowed for a more flexible schedule and cash flow than standard construction projects, the process required formal client approvals, funding confirmations, and detailed scheduling. Special coordination was needed with the concrete crew based in Atascadero, 25 minutes north of San Luis Obispo, to align availability for pours and installations. This hands-on experience strengthened students’ skills in integrated project delivery, client communication, and partner collaboration.
URL: https://digitalcommons.calpoly.edu/cmsp/1006
Poster Board
Included in
Construction Engineering Commons, Construction Engineering and Management Commons, Landscape Architecture Commons