Abstract

The goal of this project was to design a pipeline that could be installed to replace an existing drain in West Stanislaus Irrigation District. The pipeline would give the district the ability to divert drain water back into their delivery system or send water down the existing drain.

The design attempted to use pipe and material the district already has and provided construction drawings and installation instructions for the construction of this design in the future.